Sign in

Descripción de la compañía

Álbum de la compañía

Información básica

Capacidad del producto

El flujo de producción

Material purchase
The 1st step of out production process is to purchase high quality material to start standardized production.
Incoming inspection
Once the material reached in our factory our gatekeeper check the quality and quantity of our ordered material and then allow gate pass.
Storage
The next step after material checking is to store the material with proper safety measures.
Pattern cutting
We have 2 pattern cutting masters in our factory. They are very professional and skillful in their job.
Material cutting
We have 4 material cutting masters in our factory. They are very professional and skillful in their job.

El equipo de producción

Nombre
No
Cantidad
Verificado
JUKI, JACK, ZOJE, PEGASUS
MANUEL (F4), FULLY AUTOMATIC (A4)
1058
Verificado

Información de fábrica

Tamaño de la fábrica
Below 1,000 square meters
Ubicación de la fábrica
Near Pizza Cottage, Aiman Abad road, Nawan Pind, Sialkot
N° de líneas de producción
5
Fabricación por contrato
OEM Service Offered, Design Service Offered, Buyer Label Offered
Valor de producción anual
US$5 Million - US$10 Million

La capacidad de producción anual

Nombre del producto
Unidades producidas
HighestEver
UnitType
Verificado
Motorbike suit
20000
25000
Set/Sets
Motorbike jackets
15000
20000
Piece/Pieces
Motorbike gloves
30000
45000
Pair/Pairs
Soccer uniform
40000
50000
Set/Sets
Tracksuit
55000
60000
Set/Sets
Verificado

Línea de producción

Línea de producción
Supervisor
NO, de los operadores
NO, de en-línea QC/QA
Verificado
Motorbike garments
2
20
3
Team wears
2
20
3
Casual wears
2
20
3
Gloves collection
2
20
3
Fitness wear
2
20
3
Verificado

Capacidad de I&D

Investigación & Desarrollo

5 - 10 People