Sign in

Visão geral da empresa

Álbum da empresa

Informações básicas

A Capacidade do produto

Fluxo de produção

Material purchase
The 1st step of out production process is to purchase high quality material to start standardized production.
Incoming inspection
Once the material reached in our factory our gatekeeper check the quality and quantity of our ordered material and then allow gate pass.
Storage
The next step after material checking is to store the material with proper safety measures.
Pattern cutting
We have 2 pattern cutting masters in our factory. They are very professional and skillful in their job.
Material cutting
We have 4 material cutting masters in our factory. They are very professional and skillful in their job.

Equipamentos de produção

Nome
Não
Quantidade
Verificado
JUKI, JACK, ZOJE, PEGASUS
MANUEL (F4), FULLY AUTOMATIC (A4)
1058
Verificado

Informações fábrica

Tamanho da fábrica
Below 1,000 square meters
Localização da fábrica
Near Pizza Cottage, Aiman Abad road, Nawan Pind, Sialkot
Nº das linhas de produção
5
Fabricação de contrato
OEM Service Offered, Design Service Offered, Buyer Label Offered
Valor da produção anual
US$5 Million - US$10 Million

Capacidade de Produção anual

Nome do produto
Unidades Produzidas
HighestEver
UnitType
Verificado
Motorbike suit
20000
25000
Set/Sets
Motorbike jackets
15000
20000
Piece/Pieces
Motorbike gloves
30000
45000
Pair/Pairs
Soccer uniform
40000
50000
Set/Sets
Tracksuit
55000
60000
Set/Sets
Verificado

Linha de produção

Linha de produção
Supervisor
NÃO. de Operadores
NÃO. de In-line QC/QA
Verificado
Motorbike garments
2
20
3
Team wears
2
20
3
Casual wears
2
20
3
Gloves collection
2
20
3
Fitness wear
2
20
3
Verificado

R & D Capacidade

Pesquisa & Desenvolvimento

5 - 10 People